Cisco 010-151 Exam

Which three troubleshooting procedures do you perform when there is no power to a Cisco UCS B250 M2 Blade Server? (Choose three.)

  • A. Decommission and acknowledge the blade.
  • B. Check the back of the blade to ensure that there is no damage to the connection that goes into chassis.
  • C. Reseat the memory DIMMs.
  • D. Check the CPU sockets for bent pins.
  • E. Reseat the blade in the same slot in the chassis.
  • F. Move the blade to another slot in the chassis.
Answer: Option B. E. F.
Explanation: 

No answer description available for this question

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button

Adblock Detected

Please consider supporting us by disabling your ad blocker
error: Alert: Content is protected !!