Cisco 700-302 Exam

Which high availability design consideration produces savings by reducing the number of power supplies that are required per switch and the number of outlets that are required in the wiring closet?

  • A. Spanning VLANs
  • B. QoS
  • C. StackPower
  • D. Gateway redundancy
Answer: Option C.
Explanation: 

No answer description available for this question

Leave a Reply

Your email address will not be published.

Back to top button

Adblock Detected

Please consider supporting us by disabling your ad blocker
error: Alert: Content is protected !!