Cisco 010-151 Exam

Which five things should the administrator verify after performing maintenance or replacing a blade server? (Choose five.)

  • A. blade server status
  • B. hard drive status
  • C. host OS boot status
  • D. CPU status
  • E. mezzanine card status
  • F. memory DIMM status
  • G. fan and power status
Answer: Option A. B. D. E. F.
Explanation: 

No answer description available for this question

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button

Adblock Detected

Please consider supporting us by disabling your ad blocker
error: Alert: Content is protected !!