200-301 Cisco Certified Network Associate (CCNA)

Connectivity between four routers has been established. IP connectivity must be configured in the order presented to complete the implementation. No dynamic routing protocols are included.

Connectivity between four routers has been established. IP connectivity must be configured in the order presented to complete the implementation. No dynamic routing protocols are included.
1. Configure static routing using host routes to establish connectivity from router R3 to the router R1 Loopback address using the source IP of 209.165.200.230.
2. Configure an IPv4 default route on router R2 destined for router R4.
3. Configure an IPv6 default router on router R2 destined for router R4.

  • A. See the Explanation below.
Answer: Option A.
Explanation: 

1.- on R3
config terminal
ip route 192.168.1.1 255.255.255.255 209.165.200.229
end
copy running start
2.- on R2
config terminal
ip route 0.0.0.0 0.0.0.0 209.165.202.130
end
copy running start
3.- on R2
config terminal
ipv6 route ::/0 2001:db8:abcd::2
end
copy running start

Leave a Reply

Your email address will not be published. Required fields are marked *

Back to top button
error: Alert: Content is protected !!

Adblock Detected

Please consider supporting us by disabling your ad blocker