300-425 Designing Cisco Enterprise Wireless Networks (300-425 ENWLSD)

A network engineer is preparing for an office site survey with a height of 2.5 meters. Which three components are recommended to complete the survey? (Choose three.)

  • A. Use a battery pack to power APs
  • B. Use a drawing of the office space to draw AP and client placements.
  • C. Use DoS attack on APs while measuring the throughput.
  • D. Use APs with directional antennas.
  • E. Use APs with external antennas.
  • F. Use APs with built-in antennas.
Answer: Option A, B, F.
Explanation: 

No answer description available for this question.